In the realm of equipment maintenance and repair, lockout and tagout (LOTO) procedures are of utmost importance. These practices are designed to prevent unexpected energizing or starting of machinery, safeguarding both workers and the equipment itself.
When a piece of equipment requires maintenance or repair, it should first be locked out, preventing any movement. Moreover, any stored energy within the equipment must be blocked from release to ensure safety.
The process of LOTO involves several key steps. First, affected employees must be notified about the upcoming maintenance or repair, and the equipment's impending lockout and tagging.
Next, all energy sources connected to the equipment, such as electrical, mechanical, hydraulic, pneumatic, chemical, and thermal energy, must be identified. The equipment is then properly shut down to cease all operational functions.
Once the equipment is isolated from its energy sources, this is achieved by turning off or disconnecting switches, valves, or other isolation devices. Lockout devices, like padlocks or lockout hasps, are then applied on energy-isolating devices to physically prevent re-energization.
Tagout devices with warning tags indicating that the equipment is locked out and must not be operated are attached at this stage. The equipment is then tested to ensure it is safely de-energized and isolated, with no residual or stored energy remaining and the equipment unable to be energized.
The maintenance or repair work is carried out while the equipment remains locked and tagged out. Upon completion of the work, lockout/tagout devices are removed only by the authorized employees who applied them.
The equipment is then re-energized and tested to ensure it is functioning properly before returning to normal service. Affected employees are informed that the equipment is back in service.
Additional considerations include using authorized, individually assigned lockout devices, never leaving lockout/tagout devices on beyond an employee’s work shift without following specific procedures for shift changes, and coordinating multi-group lockout/tagout boundaries when multiple teams or contractors are involved.
These steps are guided by OSHA standards such as 29 CFR 1910.147 and involve thorough training for authorized personnel to prevent hazardous energy release and protect employees from injury during service and maintenance tasks.
Common mistakes in lockouts include leaving keys in the locks, locking the control circuit and not the main disconnect or switch, and not testing the controls to make sure they are definitely inoperative. Always adhering to these guidelines ensures a safe and efficient work environment.
[1]: Reference for OSHA standards [3]: Reference for additional considerations and common mistakes in LOTO procedures
Read also:
- Impact of Alcohol Consumption During Pregnancy: Consequences and Further Details
- The cause behind increased urination after alcohol consumption is explained here.
- Toe joint arthritis: Signs, triggers, and further details
- West Nile Virus found in Kentucky for the first time; residents advised to take protective measures